Skip to main content

Brown County road projects slated for construction

By
-
Slide project In Brown County slated for construction
The Ohio Department of Transportation’s 2010 construction season is in full swing, and operations for a slip repair project on state Route 221 in Brown will get under way this month. 
“As part of a very active construction program in Brown County, this slip repair is just one of the 11 preservation, safety and enhancement projects
in which we are investing more than $12 million to preserve our infrastructure and improve our network of highways and bridges,” said District 9 Deputy Director James A. Brushart.
According to Brushart, crews from Coopers Excavating will close the route between U.S. Route 52 at Higginsport and state Route 125 at Georgetown to repair the slide and stabilize the embankment.  The route will be closed at the 4.42-mile marker, which is midway between Georgetown and Higginsport, on
Monday, June 28, weather permitting.
Coopers Excavating, of Winchester, was awarded a contract in the amount of $384,507.37 to complete the project, and while the route is
closed, motorists will be detoured by way of  U.S. Route 52, S.R. 505 and S.R. 125. 
The scheduled completion date is Aug. 31.
* In a separate project, traffic will be switched on Monday, June 21, on County Road 24 (Tri-County Highway/Main Street) in Mt. Orab, where
Tri-County Highway is closed to all eastbound traffic as part of a bridge replacement that is under way in the village.
All westbound traffic is being maintained in one lane as crews replace the bridge located immediately west of U.S. Route 68 (High Street), and
eastbound traffic is being detoured via Main Street to County Road 87 (Bodman Road) to state Route 32.
This project is scheduled to be completed by Oct. 31.
The Ohio Department of Transportation’s 2010 construction season is in full swing, and operations for a slip repair project on state Route 221 in Brown will get under way this month. 
“As part of a very active construction program in Brown County, this slip repair is just one of the 11 preservation, safety and enhancement projects in which we are investing more than $12 million to preserve our infrastructure and improve our network of highways and bridges,” said District 9 Deputy Director James A. Brushart.
According to Brushart, crews from Coopers Excavating will close the route between U.S. Route 52 at Higginsport and state Route 125 at Georgetown to repair the slide and stabilize the embankment.  The route will be closed at the 4.42-mile marker, which is midway between Georgetown and Higginsport, on Monday, June 28, weather permitting.
Coopers Excavating, of Winchester, was awarded a contract in the amount of $384,507.37 to complete the project, and while the route is closed, motorists will be detoured by way of  U.S. Route 52, S.R. 505 and S.R. 125. 
The scheduled completion date is Aug. 31.
* In a separate project, traffic will be switched on Monday, June 21, on County Road 24 (Tri-County Highway/Main Street) in Mt. Orab, where Tri-County Highway is closed to all eastbound traffic as part of a bridge replacement that is under way in the village.
All westbound traffic is being maintained in one lane as crews replace the bridge located immediately west of U.S. Route 68 (High Street), and eastbound traffic is being detoured via Main Street to County Road 87 (Bodman Road) to state Route 32.
This project is scheduled to be completed by Oct. 31.
[[In-content Ad]]

Add new comment

This is not for publication.
This is not for publication.

Plain text

  • No HTML tags allowed.
  • Lines and paragraphs break automatically.
  • Web page addresses and email addresses turn into links automatically.
Article comments are not posted immediately to the Web site. Each submission must be approved by the Web site editor, who may edit content for appropriateness. There may be a delay of 24-48 hours for any submission while the web site editor reviews and approves it. Note: All information on this form is required. Your telephone number and email address is for our use only, and will not be attached to your comment.
CAPTCHA This question is for testing whether or not you are a human visitor and to prevent automated spam submissions. Image CAPTCHA
Enter the characters shown in the image.